View | Details | Raw Unified | Return to bug 76586
Collapse All | Expand All

(-)en/releng/index.sgml (-6 / +7 lines)
Lines 19-24 Link Here
19
<ul>
19
<ul>
20
  <li><a href="#schedule">Upcoming Release Schedule</a></li>
20
  <li><a href="#schedule">Upcoming Release Schedule</a></li>
21
  <li><a href="#freeze">Code Freeze Status</a></li>
21
  <li><a href="#freeze">Code Freeze Status</a></li>
22
  <li><a href="&base;/releases/5.3R/errata_policy.html">Errata Policy for
23
  the 5.3 Release</a></li>
22
  <li><a href="&base;/releng/charter.html">Charter for the Release
24
  <li><a href="&base;/releng/charter.html">Charter for the Release
23
  Engineering Team</a></li>
25
  Engineering Team</a></li>
24
  <li><a href="#docs">Release Engineering Documentation</a></li>
26
  <li><a href="#docs">Release Engineering Documentation</a></li>
Lines 37-46 Link Here
37
  slippage.</p>
39
  slippage.</p>
38
40
39
<ul>
41
<ul>
40
  <li><p><strong>TBD 2005</strong> : FreeBSD 5.4 (schedule, <a
42
  <li><p><strong>March 2005</strong> : FreeBSD 5.4 (schedule, <a
41
    href="&base;/releases/5.4R/todo.html">todo list</a>, commit policy)</p></li>
43
    href="&base;/releases/5.4R/todo.html">todo list</a>, commit policy)</p></li>
42
  <li><p><strong>November 2004</strong> : FreeBSD 5.3 (<a
43
    href="&base;/releases/5.3R/errata_policy.html">errata policy</a>)</p></li>
44
  <li><p><strong>January 2005</strong> : FreeBSD 4.11 (<a
44
  <li><p><strong>January 2005</strong> : FreeBSD 4.11 (<a
45
    href="&base;/releases/4.11R/schedule.html">schedule</a>)</p></li>
45
    href="&base;/releases/4.11R/schedule.html">schedule</a>)</p></li>
46
</ul>
46
</ul>
Lines 243-251 Link Here
243
        href="&base;/doc/en_US.ISO8859-1/articles/5-roadmap/index.html">FreeBSD
243
        href="&base;/doc/en_US.ISO8859-1/articles/5-roadmap/index.html">FreeBSD
244
        5-STABLE Roadmap</a><br>
244
        5-STABLE Roadmap</a><br>
245
245
246
      <small>Describes the roadmap for the project for reaching the RELENG_5
246
      <small>Described the roadmap for the project for reaching the RELENG_5
247
        branch.  Includes overall status of 5.x, what's left to be done, and
247
        branch.  Included overall status of 5.x, what was left to be done, and
248
        tentative schedules.</small></p></li>
248
        tentative schedules.  (Note: this document is now somewhat out of
249
        date.)</small></p></li>
249
250
250
</ul>
251
</ul>

Return to bug 76586